V2

Qassim II
Ringo Contract: WO-11318
6%
Completion
Current: Pre-assembly

๐Ÿ› ๏ธ 7-Stage Progress Timeline

1

Material Ready

Pending
Sub-steps (0/4 done)
  • โ—‹ 1. BOM verification
  • โ—‹ 2. Parts kitting inspection
  • โ—‹ 3. Outbound handover to workshop
  • โ—‹ 4. Critical items recheck (seals)
2

Sandblasting

Pending
Sub-steps (0/3 done)
  • โ—‹ 1. Arrival at subcontractor
  • โ—‹ 2. Sealing face protection / Sandblasting / Inspection
  • โ—‹ 3. Transport back to SCC
3

Pre-assembly

In progress
Started: 2026-06-12 06:04
Sub-steps (2/5 done, 1 doing)
  • โœ“ 1. Dismounting of bush stem of AUMA
  • โœ“ 2. Bush stem machining
  • โ— 3. Bush stem testing โ€” Needs to be re-machined.
  • โ—‹ 4. Remounting bush stem of AUMA actuator
  • โ—‹ 5. Screws testing between bonnet & glad
4

Assembly

Pending
Started: 2026-06-12 04:53
Sub-steps (0/12 done)
  • โ—‹ 1. Position valve body in pit fixture
  • โ—‹ 2. Install disc
  • โ—‹ 3. Stem & bonnet prepared
  • โ—‹ 4. Install bonnet, stem
  • โ—‹ 5. Install seals & packing
  • โ—‹ 6. Pre-tighten gland bolts
  • โ—‹ 7. Body nut hydraulic tightening (2 stages)
  • โ—‹ 8. Final gland bolt tightening
  • โ—‹ 9. Lift out from pit
  • โ—‹ 10. AUMA actuator coupling & alignment
  • โ—‹ 11. AUMA actuator power connected
  • โ—‹ 12. AUMA actuator calibration
5

Testing & FAT

Pending
Sub-steps (0/7 done)
  • โ—‹ 1. Horizontal adjustment
  • โ—‹ 2. Clamp onto test bench
  • โ—‹ 3. Shell hydrostatic test
  • โ—‹ 4. Backseat test
  • โ—‹ 5. Seat leakage test
  • โ—‹ 6. Test report
  • โ—‹ 7. Download from test bench
6

Painting

Pending
Sub-steps (0/5 done)
  • โ—‹ 1. Protection & surface cleaning
  • โ—‹ 2. Primer coating
  • โ—‹ 3. Intermediate / Topcoat
  • โ—‹ 4. Coating thickness inspection
  • โ—‹ 5. Drying & curing
7

Packing

Pending
Sub-steps (0/4 done)
  • โ—‹ 1. Protection
  • โ—‹ 2. Custom wooden crate & cushioning
  • โ—‹ 3. Crating, fixing & lashing
  • โ—‹ 4. Packing list & shipping documents
8

Shipped

Pending
Sub-steps (0/3 done)
  • โ—‹ 1. Loading
  • โ—‹ 2. Bill of lading / Logistics documents
  • โ—‹ 3. Customer receipt confirmation

๐Ÿ“ธ Photo Records (2)

Pre-assembly
2026-06-12 06:19
Pre-assembly
2026-06-12 06:19